Olympus スポーツベット 税金 Facility A
| Construction Period | July 2022 - December 2023 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 16,368 sq.m. |
| Location | スポーツベット 税金, Japan |
| Construction Period | July 2022 - December 2023 |
|---|---|
| Structure / Floors | Steel 3F |
| Total Floor Area | 16,368 sq.m. |
| Location | スポーツベット 税金, Japan |