スポーツベット twitter Mirai Child Development Support Center
| Construction Period | December 2023 - January 2025 |
|---|---|
| Structure / Floors | Reinforced Concrete 3F-PH1 |
| Total Floor Area | 1,544 sq.m. |
| Location | スポーツベット twitter, Japan |
| Construction Period | December 2023 - January 2025 |
|---|---|
| Structure / Floors | Reinforced Concrete 3F-PH1 |
| Total Floor Area | 1,544 sq.m. |
| Location | スポーツベット twitter, Japan |