OSAKA TOYOPET Head office Parking スポーツベット 必勝チャンネル
| Construction Period | August 2021 - March 2023 |
|---|---|
| Structure / Floors | Steel,Steel Reinforced Concrete, B2-4F-PH1 |
| Total Floor Area | 5,529 sq.m. |
| Location | スポーツベット 必勝チャンネルJapan |
| Construction Period | August 2021 - March 2023 |
|---|---|
| Structure / Floors | Steel,Steel Reinforced Concrete, B2-4F-PH1 |
| Total Floor Area | 5,529 sq.m. |
| Location | スポーツベット 必勝チャンネルJapan |