ZEN-NOH Logistics スポーツベット 評判 Warehouse, Warehouse Building No.7
| Construction Period | December 2021 - March 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel, 2F |
| Total Floor Area | 16,554 sq.m. |
| Location | スポーツベット 評判Japan |
| Construction Period | December 2021 - March 2023 |
|---|---|
| Structure / Floors | Reinforced Concrete,Steel, 2F |
| Total Floor Area | 16,554 sq.m. |
| Location | スポーツベット 評判Japan |