KOSÉ Gunma Factory スポーツベット 評判30 Plant
| Construction Period | September 2015 - November 2016 |
|---|---|
| Structure / Floors | Steel, 3F |
| Total Floor Area | 18,631 sq.m. |
| Location | スポーツベット 評判, Japan |
| Construction Period | September 2015 - November 2016 |
|---|---|
| Structure / Floors | Steel, 3F |
| Total Floor Area | 18,631 sq.m. |
| Location | スポーツベット 評判, Japan |