スポーツベット テニス Seikei University in front of station
| Construction Period | September 2021 - February 2023 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete 8F-PH1 |
| Total Floor Area | 9,776 sq.m. |
| Location | スポーツベット テニス, Japan |
| Construction Period | September 2021 - February 2023 |
|---|---|
| Structure / Floors | Steel Reinforced Concrete 8F-PH1 |
| Total Floor Area | 9,776 sq.m. |
| Location | スポーツベット テニス, Japan |