Karaksa hotel grande Shin-スポーツくじ ベット 自動化 Tower
| Construction Period | June 2017 - August 2019 |
|---|---|
| Structure / Floors | Steel,Steel Reinforced Concrete, B1-24F-PH1 |
| Total Floor Area | 18,520 sq.m. |
| Location | スポーツくじ ベット 自動化, Japan |
| Construction Period | June 2017 - August 2019 |
|---|---|
| Structure / Floors | Steel,Steel Reinforced Concrete, B1-24F-PH1 |
| Total Floor Area | 18,520 sq.m. |
| Location | スポーツくじ ベット 自動化, Japan |