SENRITO YOMIURI
| Construction Period | April 2014 - March 2017 |
|---|---|
| Structure / Floors | 1: Steel, B1-7F-PH1r 2: Steel, B1-7F-PH1 |
| Total Floor Area | 1: 20,884 sq.m., 2: 15,688 sq.m. |
| Location | Osaka, Japan |
| Construction Period | April 2014 - March 2017 |
|---|---|
| Structure / Floors | 1: Steel, B1-7F-PH1r 2: Steel, B1-7F-PH1 |
| Total Floor Area | 1: 20,884 sq.m., 2: 15,688 sq.m. |
| Location | Osaka, Japan |